GARAFRAXA ST SALON AND SPA RENOVATION | JCB AND SONS

Brick's are starting to go back on the west wall over the new lintels!!

We had to bring our tractor down to move skids of brick.

New steel formed C channel and our new triple lintels which are also welded

for added strength to carry the structural load of the triple brick wall

over the door opening in the west wall

We had to make some structural repairs on the corners of the building.

The damage we found created by adding a door in a triple brick wall and not installing

any lintels in the west wall.

Water damage to the windows meant some more repair work.

After removing the unwanted windows we began installing new 2" x 4" spruce girts with

sill gasket between the brick and the lumber. This has been a task as the

wall waves in and out over 2".

Previous
Previous

WEST GREY GARAFRAXA ST SALON AND SPA SIDING INSTALL | JCB and SONS

Next
Next

WEST GREY GARAFRAXA ST SALON AND SPA EXTERIOR RENOVATION | JCB and SONS