WEST GREY GARAFRAXA ST SALON AND SPA SIDING INSTALL | JCB and SONS
We have started to install the Steel Siding on the West Wall so we can move our
scaffolding to other locations on the building.
We added a step in the profile of the fascia board to dress up the face of the building
and add to the commercial look of this project.
This is a view of the West and South walls.
This is a view of the West and North walls.
Here is a photo the our new scaffolding set up and ready to start installing the
new steel trims. We actually ended up shimming this West wall out 6" in places
to make it plumb and straight for the new siding.
The South wall is ready for windows and trims. The Patio Door on the right
side of the South wall will be being removed and a window will be installed
there too.
We install the new Strassburger windows on the North Wall. It's now ready for trims and siding.
GARAFRAXA ST SALON AND SPA RENOVATION | JCB AND SONS
Brick's are starting to go back on the west wall over the new lintels!!
We had to bring our tractor down to move skids of brick.
New steel formed C channel and our new triple lintels which are also welded
for added strength to carry the structural load of the triple brick wall
over the door opening in the west wall
We had to make some structural repairs on the corners of the building.
The damage we found created by adding a door in a triple brick wall and not installing
any lintels in the west wall.
Water damage to the windows meant some more repair work.
After removing the unwanted windows we began installing new 2" x 4" spruce girts with
sill gasket between the brick and the lumber. This has been a task as the
wall waves in and out over 2".
WEST GREY GARAFRAXA ST SALON AND SPA EXTERIOR RENOVATION | JCB and SONS
Cutting the brick, getting ready for repairs! We had a busy day today. The back of the building is in need of a lot of work after removing the old addition which was in very bad shape. The brick needed to be cut so we can prepare for repairs to the brick and the new steel siding.