New Addition, Log Home Christian Bender New Addition, Log Home Christian Bender

WEST GREY, ONTARIO | PRICEVILLE HERITAGE LOG HOME ADDITION & RENOVATION

West Grey, Ontario | Priceville Heritage Log Home Addition & Renovation. We installed this horizontal red engineered wood siding for our customer on this project. We made and installed all the aluminum trims for this project as well. A synthetic membrane was installed on the roof for our customers chosen roofing contractor. All the windows and doors were supplied and installed by us. They were flashed with typar flashing tapes to insure a waterproof finish that will last decades.

The existing porch was kept and modified to tie into the new addition as well as extended to offer protection to the logs of the log home.

The log home had a fantastic view from the second floor, so we installed these apex shaped windows in the gable wall of the home to take advantage of it. It was one of our favourite features.

John Manville AP foil-faced 1” foam sheathing was used for the wall sheathing to provide continuous insulation over the whole addition. Providing and R-28 wall with the Rockwool batt insulation.

Prior to the install of strapping and siding we installed new Typar weather protection barrier over the existing exterior walls to protect the homes exterior.

The walls were all strapped with 1” strapping to create an air space behind all the new siding.

All the windows and doors were clad with aluminum trims we manufactured on site and installed prior to siding installation.

Check out the completed project @ > https://www.jcbandsons.com

Read More
New Addition, Log Home Christian Bender New Addition, Log Home Christian Bender

WEST GREY, ONTARIO | HERRITAGE LOG CABIN ADDITION

West Grey Ontario | Heritage Log Cabin Addition, we started an 18’ x 40’ addition this past August with a conditioned attic for storage space off the back of the old summer kitchen of this beautiful Heritage Log Home near Priceville Ontario

_D606431.jpg

We chose to excavate this project ourselves giving us full control of the schedule, as well as allowing us to use smaller equipment to keep the construction footprint as minimal as possible.

_D606501.jpg
_D606557.jpg
_D606845.jpg

Two runs of rebar were ran in the 8” x 24” footing to keep it super strong set 4’-0” below finished grade to give proper frost protection.

_D606852.jpg

We also formed this project ourselves with Strip-Ease forms to control the schedule keeping the project moving without delays.

Jude Bender pouring concrete

Jude Bender on site helping pour walls and making sure equipment was where it needed to be for the guys.

_D606897.jpg

We take a lot of pride keeping our sites clean, keeping ourselves and our clients safe as well as keeping project running efficently.

_D606906.jpg
_D606920.jpg

Amvic Envirosheet was used to provide R10 insulation around the perimeter of the foundation as well as under the poured concrete floor.

_D606930.jpg
_D606941.jpg
_D606957.jpg
_D606961.jpg
_D606968.jpg

John Bender himself on site making sure this floor turned out perfect for this project.

_D607016.jpg

Shout out to Miller’s Concrete for being an amazing supplier and always going the extra mile for us and our customers.

🔔Subscribe to follow our work!Website: https://www.jcbandsons.com#JCBandSONS#ChristianBenderFollow JCB and SONS on social!Facebook: https://www.facebook.com...
🔔Subscribe to follow our work!Website: https://www.jcbandsons.com#JCBandSONS#ChristianBenderFollow JCB and SONS on social!Facebook: https://www.facebook.com...
Read More