TRUSSCORE PVC LINER IS GOING IN THE SOUTHGATE HONEY SHED BUILD | JCB AND SONS
PVC Liner is going in the Southgate Honey Shed Build | JCB & SONS. We installed 1/4"
board inside of the original pole shed prior to the polyurethane spray foam. This allowed an air space between the foam and the roof steel, and also prevents the foam from bonding to the roof steel in the event it ever had to be replaced.
Both the original pole shed and the new addition received new steel trims and wall steel to modernize the building and make it all match.
The roof of the original building was spray foamed to allow the open webbing of the trusses to stay exposed and allow more storage.
The walls of the addition were spray foamed to ensure an air tight seal on the extraction room walls to make it easy to heat and keep out any bees during the honey extraction process.
from Durham did a super clean install on these 50,000 BTU Propane heaters from
. Two heaters where installed on separate thermostats to allow the heating to be controlled in the extraction room, and shop/storage areas separately
PVC Liner is being installed on the ceiling and walls of the extraction room. Its a food grade liner, which is smooth and easy to clean, and white keeping the room bright. Also this liner is manufactured in Palmerston, ON allowing us to support local business.
WALL STEEL IS GOING ON THE SOUTHGATE HONEY SHED BUILD | JCB AND SONS
Wall steel is going on the Southgate Honey Shed Build | JCB & SONS. Was an exciting day today finally seeing some colour go on the Honey Shed Project. We really love how this new colour steel from
makes the building come together.
They Honey extraction room is being spray foamed. We installed the Typar House wrap to make a barrier between the spray foam and the new wall steel. The old building is being insulated with
Insulation and so this
on the old part with create a proper air barrier and create a sealed envelope.
The remainder of the old wall steel will be taken off and the new steel will cover the entire building. The old steel will be reused on the interior of the original building which will be storage and work shop for the honey business.
We installed this 2" x 6" board in the open web of the old building to create a spot to route the new wiring as their will be no ceiling in this part and all the wiring in the trusses will be exposed.
We had trims made to trim out the contractor grade steel insulated doors, making a nice clean transition to the new wall steel. The doors were installed with no windows to make blacking out the building easier when certain aspects of the bee keeping business require a dark working space.
This is the new utility room in the building. This is where the water comes into the building, the new 100 amp electrical panel, and catch basin for the extraction room gutter drain is located. It will be lined with plywood to make it easy to mount all the utilities, and the hot water tank will be located.
This door opening is ready for the new
insulated overhead door. We cladded all the interior with white steel to match the new liner and make a very clean surface to mount the new door track too.
HONEY SHED IS READY FOR CEMENT IN SOUTHGATE | JCB AND SONS
Honey Shed is ready for cement in Southgate | JCB & SONS. The drains are all roughed in for our honey shed build. The ABS drains will remove waste water from the centre gutter floor drain which will go into the sump pail catch basin and than the water will leave in an overflow allowing the catch basin to be cleaned out. We also plumbed in drains for a double stainless steel sink in the extraction room and a full bathroom.
The new steel roof is completed allowing us a dry building to pour our new floor in the building.
We have installed Typar, which will keep things dry while we pour the floor. It will also be a barrier between the new wall steel and the spray foam insulation we will be installing.
The extraction room, utility room, and bathroom all have received 1.5"
(R7.5) under the new cement floor to make a really energy efficient building. This will make the building easy to heat, and cost efficient.
The Sump Pail is acting as our catch basin, all the water from the centre gutter drain in the extraction room come to this pail in the utility room and than exit the building. The overflow in the drain has a 90 degree fitting on it to allow the water out but not allow any gasses back into the building.
We can't wait to pour the new floor for this project.