ELECTRICAL, PLUMBING, HVAC STAGE OF PRICEVILLE RENO | JCB AND SONS
Electrical, Plumbing, HVAC stage of Priceville Reno | JCB & SONS. We have installed the new
. This adds a breathable layer of moisture protection to the outside of the home before the siding is installed ensuring the elements can't get in but your wall cavity can breath keeping it dry.
We installed really strong collar ties to ensure this rafter roof will stand another 100 years and also as bracing for the demolition portion of the job. The roof has dipped a bit over the years, so this has locked everything into place. We have now combined those collar ties with new 2" x 8" ceiling joists.
The basement walls are all framed up and ready for all the wiring, plumbing, insulation.
Because of the span on the rafters we also strapped all the ceiling with 2" x 4" @ 16" o.c. to install our drywall. This also further contributes to tying the old walls together and strengthening the old roof.
The pink things in the roof are
. These are a must to allow an air space between your insulation and roof sheathing. It allows your attic to vent properly thus preventing
1 and also making your shingles last much longer.
The one bedroom and bathroom will be receiving pocket doors. The entire second floor will be receiving spray foam insulation.
The back half of the roof has been stripped of all the old shingles and the roof sheathing has been repaired and re-nailed. We installed two runs of
along the eaves and also one run in the valley's. We covered the remainder of the roof in
. This meets Ontario Building Code, keeps the house dry until shingled, and also meets the shingle manufactures requirements to be covered under their warranty. If the roof fails prematurely and this isn't done you will not be covered under warranty.
All of the heat runs and cold air returns are in for the first and second floors. The landing is also in for the new stairs.
This wall is for the laundry shoot and also created a chase for the main plumbing stack for the house.
has done an awesome job or wiring our project up, they will be roughing in for an alarm system, central vac, as well as a generator back up.
All of our plumbing rough in is in and passed inspection this week ready for insulation and drywall.
is installing an awesome high efficiency propane furnace,
, air conditioning. This will have the home comfortable all year round and with healthy clean air to breath.
We all started young in the Bender family on a broom. Clean job sites are important to us!
HONEY SHED IS READY FOR CEMENT IN SOUTHGATE | JCB AND SONS
Honey Shed is ready for cement in Southgate | JCB & SONS. The drains are all roughed in for our honey shed build. The ABS drains will remove waste water from the centre gutter floor drain which will go into the sump pail catch basin and than the water will leave in an overflow allowing the catch basin to be cleaned out. We also plumbed in drains for a double stainless steel sink in the extraction room and a full bathroom.
The new steel roof is completed allowing us a dry building to pour our new floor in the building.
We have installed Typar, which will keep things dry while we pour the floor. It will also be a barrier between the new wall steel and the spray foam insulation we will be installing.
The extraction room, utility room, and bathroom all have received 1.5"
(R7.5) under the new cement floor to make a really energy efficient building. This will make the building easy to heat, and cost efficient.
The Sump Pail is acting as our catch basin, all the water from the centre gutter drain in the extraction room come to this pail in the utility room and than exit the building. The overflow in the drain has a 90 degree fitting on it to allow the water out but not allow any gasses back into the building.
We can't wait to pour the new floor for this project.